The brief was short: a power point in the carport and a charger for the new electric car. By the time we left this Ormond home, we had also got rid of two power boards, replaced twelve downlights and added power where the family actually needed it.
That is pretty normal. When we come out to quote one job, owners usually have a list of small things they have been meaning to sort.
The quote visit
We met the owner at 7.30am on Monday 26 October, walked through the house and carport, and quoted the lot. The quote was signed and we booked the install for Friday.

The EV charger circuit
An electric car charger should never share a circuit with anything else. It pulls a heavy load for hours at a time, which is exactly what an ordinary power circuit is not built for. So we:
- Ran a new dedicated 32 amp circuit from the switchboard in 6mm cable, through the roof space and down the external wall in conduit
- Fitted a new 32 amp individual safety switch in the sub board to protect that circuit, as current wiring standards require
- Installed an isolator in the carport, so the charger can be switched off locally for servicing
- Mounted and wired the owner’s own charger, an MG wall charger, on the external wall, then tested it and left it charging the car

The carport power point
Separately, we picked up power from an existing power circuit and installed a new double weatherproof power point in the carport, with the cable run through the roof space and down the external wall in conduit. Handy for a vacuum, a pressure washer or a trickle charger, and rated for an outdoor spot.
Inside the house
This is where the list grew:
- Office: a new quad power point under the desk to get rid of a power board, fed from the new weatherproof point on the external wall
- Lounge room: a new quad power point, also to replace a power board, with the cable run in ducting along the skirting
- Bedrooms: in one bedroom, two existing double power points upgraded to quads; in another, a new quad fed from an existing point, run in ducting along the skirting
- Kitchen: two double power points replaced with new ones
- Lighting: twelve old 70mm globe fittings swapped for 70mm LED downlights, 10 watt and tri-colour so the owner can pick warm, neutral or cool light, each with a five year warranty
Running cable in ducting along the skirting meant no chasing walls and no patching or painting afterwards.
Finished
The crew worked through Friday 30 October and handed over a certificate of compliance for all of it. The car charges on its own protected circuit, the carport has outdoor rated power, and the power boards are gone.
Plenty of Ormond households are going all electric. Many of the interwar homes here were never wired for an EV, solar and a heat pump on top of a modern kitchen, so planning the circuits properly matters.
Safety tip
Do not charge an electric car from a power board or an extension lead, even for one night. They are not made for hours of heavy continuous load and can overheat. Use a dedicated circuit, or at minimum have an electrician check the outdoor power point you plan to use.